空壓(ya)機的停用(yong)在各個單(dān)位都常有(you)發生。那麼(me)在初次開(kāi)機👨❤️👨前👣空⛱️壓(ya)機停放時(shi)間超過三(san)個月或空(kong)壓機😄停用(yòng)時間超過(guò)三個月,再(zài)次開機前(qián)需要采取(qǔ)有效措施(shi),bi須🏃🏻♂️先請專(zhuan)業空壓機(ji)人員對機(jī)器進行保(bao)養檢測,制(zhi)定安全措(cuo)施,避免開(kāi)機後發生(shēng)不良狀況(kuang)。
The shutdown of air compressors often occurs in various units. Then, before the first start-up, the air compressor parking time is more than three months or the air compressor parking time is more than three months. Before the second start-up, effective measures need to be taken. The Bi must first ask professional air compressor personnel to carry out maintenance and inspection of the machine, and formulate safety measures to avoid adverse conditions after the start-up.
1、先檢查電(dian)路狀态,是(shì)否正常供(gòng)電,電壓是(shi)否穩定;測(cè)量電動機(jī)絕🤟緣電阻(zu),數值大于(yu)1MΩ。
1. Check the state of the circuit first, whether the power supply is normal, whether the voltage is stable; Measure the insulation resistance of the motor, the value is greater than 1M.
2、檢查空壓(ya)機配件上(shang)是否含有(yǒu)積水,灰塵(chén),及時清理(lǐ)。
2. Check whether there is water and dust on the spare parts of air compressor, and clean them up in time.
3、對進氣口(kou),出氣口全(quán)面檢測,防(fang)止發生堵(du)塞現象
3. Overall inspection of intake and outlet to prevent blockage
4、在(zai)上述都已(yi)經完成的(de)情況可以(yǐ)接通電源(yuán),查看電㊙️腦(nao)控制器是(shi)🎯否正常運(yùn)行
4. If all the above have been completed, the power supply can be connected to check whether the computer controller is working properly.
5、更換三(san)濾和潤滑(huá)油。因為在(zai)長期不用(yong)的情況下(xià),三🈲濾,油可(ke)💔能㊙️發生老(lǎo)化現象,從(cóng)而造成空(kong)壓機開機(jī)運行時間(jiān)不長即結(jie)膠積碳或(huò)堵塞,油路(lù)不暢使空(kong)壓機主機(jī)或其他零(ling)部件損壞(huai)。
5. Replace three filters and lubricants. Because in the case of long-term non-use, three filters may cause oil aging phenomenon, which causes the air compressor start-up time is not long, that is, cementing carbon deposit or blockage, oil circuit is not smooth, so that air compressor main engine or other parts are damaged.
6、專業人員(yuán)試機,電路(lu)改造後人(rén)工控制加(jia)載卸載,先(xian)空🌈載運行(hang)10分♉鐘以上(shang),檢測各項(xiang)指标和震(zhen)動、噪音等(deng)正常,再進(jin)行加⚽載,查(cha)❗看各部件(jiàn)運行正常(cháng)即可。
6. Professional personnel test machine, after circuit modification, manual control loading and unloading, first no-load operation for more than 10 minutes, detection of various indicators and vibration, noise and other normal, then load, check the normal operation of the components.